bSI Use Case Management Service (UCMS)

The Use Case Management Service of buildingSMART international enables the capture, specification and exchange of best practices and makes them accessible to the entire built asset industry. Throughout the entire process of design, construction and operation, the information exchange requirement must be defined for each BIM use case. Based on the Information Delivery Manual (IDM) methodology developed by buildingSMART, the operational processes and, as a result, the information exchange requirements are described. The exact definition of the information flow between the respective project participants enables collaborative work and the efficient and error-free exchange of data.

Engagement

Engage yourself on the Use Case Management Service? By doing so, you contribute to a better understanding of the BIM methodology, to the faster provision of Information Delivery Manuals (IDM) and to the overall improvement of BIM projects. The Use Case Management Service allows all members of buildingSMART as well as companies and associations to collaboratively develop their projects in a co-creation space and then publish them on the UCM website.

Introduction Training Contact

 


Overview published documents

Title Doc. Type Publisher Language Published on Last change
Modelleer- en tekeningafspraken
Technical report
NL
Apr 28, 2022
May 17, 2022
Pointcloud omgeving positioneren op 0-punt project
Case Study
NL
Jun 29, 2022
Jun 29, 2022
Consistentie sparingcontrole in het constructiemodel
Case Study
NL
Jun 29, 2022
Jun 29, 2022
Site Analysis and Planning
Use Case
BIM Speed
EN
Mar 4, 2022
May 10, 2022
BIM to BEM process – CYPETHERM procedure
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022
3D Modeling of Existing Asset Based on Point Clouds (Scan2BIM)
Use Case
BIM Speed
EN
Mar 4, 2022
May 10, 2022
Lighting and Visual Comfort Analysis
Use Case
BIM Speed
EN
Mar 4, 2022
May 10, 2022
Comfort Eye for Indoor Environmental Quality: Thermal Comfort and Indoor Air Quality
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022
Existing building Data collection and download based on IFC model definition (BACN2BIM)
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Semantic design rules and tool for deep renovation design
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022
Historical Weather Data Collection for Building Energy Modeling
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022
BIM-SPEED Library
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022
Determination of Stakeholder's BIM Maturity
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Crowd Data Collection
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Clash Detection
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Retrieving BIM data for acoustic comfort calculation
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Model Checks for compliance testing and design coordination
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 2, 2022
User Guide for Geo-referencing in IFC
Use Case
buildingSMART Australasia, buildingSMART International
EN
May 6, 2021
May 20, 2021
Veränderungsmanagement
Use Case
buildingSMART Austria
DE
Feb 18, 2022
Feb 23, 2022
Planungs- und Baubegleitendes Raumbuch
Use Case
buildingSMART Austria
DE
Jul 30, 2020
Jul 30, 2020
Ausschreibung FM
Use Case
buildingSMART Austria
DE
Feb 18, 2022
Feb 24, 2022
Ökobilanzierung
Use Case
buildingSMART Austria
DE
Feb 18, 2022
Feb 23, 2022
BIM als Kommunikationsmittel im Betrieb (POIs)
Use Case
buildingSMART Austria
DE
Feb 11, 2022
Feb 18, 2022
Raummanagement und Anlagenmanagement
Use Case
buildingSMART Austria
DE
Feb 18, 2022
Feb 24, 2022
Vierkante meters bepalen metselwerk voor inkoop
Use Case
buildingSMART Benelux
NL
Apr 20, 2022
Apr 20, 2022

Scheduled Maintenance bSI Use Case Management Service

The Use Case Management Service is under maintenance on Tuesday, Oct 04, 2022 between 18:00 - 23:00 (CET - Central European Time). The website will not be available during this time window