BIM basis ILS |
|
Standard
|
buildingSMART Benelux
|
NL
|
Feb 14, 2022
|
Apr 20, 2022
|
|
Communicatie met BCF |
|
Standard
|
buildingSMART Benelux
|
NL
|
Feb 14, 2022
|
Apr 20, 2022
|
|
Vierkante meters bepalen metselwerk voor inkoop |
|
Use Case
|
buildingSMART Benelux
|
NL
|
Apr 20, 2022
|
Apr 20, 2022
|
|
BIM Collab Enginering proces |
|
Technical report
|
buildingSMART Benelux
|
NL
|
Apr 28, 2022
|
Apr 28, 2022
|
|
Modelleer- en tekeningafspraken |
|
Technical report
|
buildingSMART Benelux
|
NL
|
Apr 28, 2022
|
May 17, 2022
|
|
Gebruik van de Dalux plugin voor modelleersoftware |
|
Standard
|
buildingSMART Benelux
|
NL
|
Jun 29, 2022
|
Jul 4, 2022
|
|
Taakgerichte tekeningen |
|
Case Study
|
buildingSMART Benelux
|
NL
|
Jun 29, 2022
|
Jun 29, 2022
|
|
Bouwmethode bepaling in VO- / DO-fase in Solibri |
|
Case Study
|
buildingSMART Benelux
|
NL
|
Jun 29, 2022
|
Jun 29, 2022
|
|
Consistentie sparingcontrole in het constructiemodel |
|
Case Study
|
buildingSMART Benelux
|
NL
|
Jun 29, 2022
|
Jun 29, 2022
|
|
Pointcloud omgeving positioneren op 0-punt project |
|
Case Study
|
buildingSMART Benelux
|
NL
|
Jun 29, 2022
|
Jun 29, 2022
|
|
Verlichtingsanalyse (LA) |
|
Information Delivery Manual
|
buildingSMART Benelux
|
NL
|
Jan 18, 2023
|
Jan 10, 2023
|
|
Géoréférencement dans la méthode BIM |
|
Use Case
|
buildingSMART Switzerland
|
FR
|
Apr 15, 2021
|
Apr 15, 2021
|
|
Relevé de bâtiments existants |
|
Use Case
|
buildingSMART Switzerland
|
FR
|
Jul 16, 2021
|
Jul 21, 2021
|
|
Prévention des chutes de hauteur |
|
Use Case
|
buildingSMART Switzerland
|
FR
|
Jul 25, 2022
|
Dec 12, 2022
|
|
Optimisation de performance s’appuyant sur un modèle (OPM) |
|
Use Case
|
buildingSMART Switzerland
|
FR
|
Nov 30, 2020
|
Mar 20, 2024
|
|
Building Programming in Design and Construction |
|
Use Case
|
buildingSMART Switzerland
|
EN
|
Jan 9, 2020
|
Jan 9, 2020
|
|
Retro BIM |
|
Use Case
|
buildingSMART Switzerland
|
EN
|
Oct 19, 2019
|
Nov 22, 2019
|
|
User Guide for Geo-referencing in IFC |
|
Use Case
|
buildingSMART Australasia, buildingSMART International
|
EN
|
May 6, 2021
|
May 20, 2021
|
|
Scheduling from the perspective of Construction Companies in the Tendering and Assembly phases |
|
Use Case
|
buildingSMART Germany
|
EN
|
Nov 25, 2021
|
Nov 25, 2021
|
|
Existing building Data collection and download based on IFC model definition (BACN2BIM) |
|
Use Case
|
BIM Speed
|
EN
|
Aug 31, 2022
|
Sep 1, 2022
|
|
Prefabrication of pipes |
|
Use Case
|
buildingSMART Switzerland
|
EN
|
Jul 1, 2020
|
Jan 28, 2022
|
|
Reinforcement modeling |
|
Use Case
|
buildingSMART Germany
|
EN
|
Nov 25, 2021
|
Nov 25, 2021
|
|
SIMBA - Statsbygg's BIM requirements |
|
Standard
|
buildingSMART International
|
EN
|
Jan 17, 2022
|
Jun 21, 2022
|
|
TecBox |
|
Use Case
|
buildingSMART Germany
|
EN
|
Feb 11, 2022
|
Feb 17, 2022
|
|
BIM base IDS |
|
Standard
|
buildingSMART Benelux
|
EN
|
Feb 14, 2022
|
Apr 20, 2022
|
|