bSI Use Case Management Service (UCMS)

The Use Case Management Service of buildingSMART international enables the capture, specification and exchange of best practices and makes them accessible to the entire built asset industry. Throughout the entire process of design, construction and operation, the information exchange requirement must be defined for each BIM use case. Based on the Information Delivery Manual (IDM) methodology developed by buildingSMART, the operational processes and, as a result, the information exchange requirements are described. The exact definition of the information flow between the respective project participants enables collaborative work and the efficient and error-free exchange of data.

Engagement

Engage yourself on the Use Case Management Service? By doing so, you contribute to a better understanding of the BIM methodology, to the faster provision of Information Delivery Manuals (IDM) and to the overall improvement of BIM projects. The Use Case Management Service allows all members of buildingSMART as well as companies and associations to collaboratively develop their projects in a co-creation space and then publish them on the UCM website.

 


Overview published documents

Title Doc. Type Publisher Language Published on Last change
BIM basis ILS
Standard
buildingSMART Benelux
NL
Feb 14, 2022
Apr 20, 2022
Communicatie met BCF
Standard
buildingSMART Benelux
NL
Feb 14, 2022
Apr 20, 2022
Vierkante meters bepalen metselwerk voor inkoop
Use Case
buildingSMART Benelux
NL
Apr 20, 2022
Apr 20, 2022
BIM Collab Enginering proces
Technical report
buildingSMART Benelux
NL
Apr 28, 2022
Apr 28, 2022
Modelleer- en tekeningafspraken
Technical report
buildingSMART Benelux
NL
Apr 28, 2022
May 17, 2022
Gebruik van de Dalux plugin voor modelleersoftware
Standard
buildingSMART Benelux
NL
Jun 29, 2022
Jul 4, 2022
Taakgerichte tekeningen
Case Study
buildingSMART Benelux
NL
Jun 29, 2022
Jun 29, 2022
Bouwmethode bepaling in VO- / DO-fase in Solibri
Case Study
buildingSMART Benelux
NL
Jun 29, 2022
Jun 29, 2022
Consistentie sparingcontrole in het constructiemodel
Case Study
buildingSMART Benelux
NL
Jun 29, 2022
Jun 29, 2022
Pointcloud omgeving positioneren op 0-punt project
Case Study
buildingSMART Benelux
NL
Jun 29, 2022
Jun 29, 2022
Verlichtingsanalyse (LA)
Information Delivery Manual
buildingSMART Benelux
NL
Jan 18, 2023
Jan 10, 2023
Géoréférencement dans la méthode BIM
Use Case
buildingSMART Switzerland
FR
Apr 15, 2021
Apr 15, 2021
Relevé de bâtiments existants
Use Case
buildingSMART Switzerland
FR
Jul 16, 2021
Jul 21, 2021
Prévention des chutes de hauteur
Use Case
buildingSMART Switzerland
FR
Jul 25, 2022
Dec 12, 2022
Optimisation de performance s’appuyant sur un modèle (OPM)
Use Case
buildingSMART Switzerland
FR
Nov 30, 2020
Mar 20, 2024
Building Programming in Design and Construction
Use Case
buildingSMART Switzerland
EN
Jan 9, 2020
Jan 9, 2020
Retro BIM
Use Case
buildingSMART Switzerland
EN
Oct 19, 2019
Nov 22, 2019
User Guide for Geo-referencing in IFC
Use Case
buildingSMART Australasia, buildingSMART International
EN
May 6, 2021
May 20, 2021
Scheduling from the perspective of Construction Companies in the Tendering and Assembly phases
Use Case
buildingSMART Germany
EN
Nov 25, 2021
Nov 25, 2021
Existing building Data collection and download based on IFC model definition (BACN2BIM)
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Prefabrication of pipes
Use Case
buildingSMART Switzerland
EN
Jul 1, 2020
Jan 28, 2022
Reinforcement modeling
Use Case
buildingSMART Germany
EN
Nov 25, 2021
Nov 25, 2021
SIMBA - Statsbygg's BIM requirements
Standard
buildingSMART International
EN
Jan 17, 2022
Jun 21, 2022
TecBox
Use Case
buildingSMART Germany
EN
Feb 11, 2022
Feb 17, 2022
BIM base IDS
Standard
buildingSMART Benelux
EN
Feb 14, 2022
Apr 20, 2022