bSI Use Case Management Service (UCMS)

The Use Case Management Service of buildingSMART international enables the capture, specification and exchange of best practices and makes them accessible to the entire built asset industry. Throughout the entire process of design, construction and operation, the information exchange requirement must be defined for each BIM use case. Based on the Information Delivery Manual (IDM) methodology developed by buildingSMART, the operational processes and, as a result, the information exchange requirements are described. The exact definition of the information flow between the respective project participants enables collaborative work and the efficient and error-free exchange of data.

Engagement

Engage yourself on the Use Case Management Service? By doing so, you contribute to a better understanding of the BIM methodology, to the faster provision of Information Delivery Manuals (IDM) and to the overall improvement of BIM projects. The Use Case Management Service allows all members of buildingSMART as well as companies and associations to collaboratively develop their projects in a co-creation space and then publish them on the UCM website.

Introduction Training Contact

 


Overview published documents

Title Doc. Type Publisher Language Published on Last change
IFC for Ports & Waterways
Standard
buildingSMART International
EN
Jan 26, 2023
Jan 27, 2023
Verlichtingsanalyse (LA)
Information Delivery Manual
buildingSMART Benelux
NL
Jan 18, 2023
Jan 10, 2023
Körperschonender Lastentransport dank optimaler Baulogistik
Guideline
buildingSMART Switzerland
DE
Dec 16, 2022
Jan 9, 2023
Creation of thermal 3D model
Use Case
BIM Speed
EN
Nov 3, 2022
Nov 3, 2022
Decision-making for residential building renovation
Use Case
BIM Speed
EN
Nov 3, 2022
Nov 3, 2022
BIM-Based LCC
Use Case
BIM Speed
EN
Nov 2, 2022
Nov 3, 2022
3D Gebäudekomplexe für das kantonale GIS
Use Case
buildingSMART Switzerland
DE
Oct 27, 2022
Oct 27, 2022
Model-based layout of reinforcement
Use Case
buildingSMART Switzerland
EN
Sep 30, 2022
Oct 5, 2022
Retrieving BIM data for acoustic comfort calculation
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Determination of Stakeholder's BIM Maturity
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Clash Detection
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Model Checks for compliance testing and design coordination
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 2, 2022
Crowd Data Collection
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Existing building Data collection and download based on IFC model definition (BACN2BIM)
Use Case
BIM Speed
EN
Aug 31, 2022
Sep 1, 2022
Model-based quantity take-off and Cost Calculation (Building Design and Construction)
Use Case
buildingSMART Germany
EN
Aug 12, 2022
Aug 12, 2022
Prévention des chutes de hauteur
Use Case
buildingSMART Switzerland
FR
Jul 25, 2022
Dec 12, 2022
Consistentie sparingcontrole in het constructiemodel
Case Study
buildingSMART Benelux
NL
Jun 29, 2022
Jun 29, 2022
Bouwmethode bepaling in VO- / DO-fase in Solibri
Case Study
buildingSMART Benelux
NL
Jun 29, 2022
Jun 29, 2022
Taakgerichte tekeningen
Case Study
buildingSMART Benelux
NL
Jun 29, 2022
Jun 29, 2022
Gebruik van de Dalux plugin voor modelleersoftware
Standard
buildingSMART Benelux
NL
Jun 29, 2022
Jul 4, 2022
Pointcloud omgeving positioneren op 0-punt project
Case Study
buildingSMART Benelux
NL
Jun 29, 2022
Jun 29, 2022
Historical Weather Data Collection for Building Energy Modeling
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022
BIM-SPEED Library
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022
Semantic design rules and tool for deep renovation design
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022
Comfort Eye for Indoor Environmental Quality: Thermal Comfort and Indoor Air Quality
Use Case
BIM Speed
EN
May 10, 2022
May 10, 2022