UCM buildingSMART International Logo
  • No results found
  • Use cases
  • Co-Creation Space
  • Community
    • buildingSMART
      • buildingSMART International
      • buildingSMART Austria
      • buildingSMART Benelux
      • buildingSMART Germany
      • buildingSMART Switzerland
    • Organizations
      • HSLU
    • Collaboration Partners
      • Companies
      • Associations & Institutions
  • en
    • en
    • de
    • fr
  • Login
Location
buildingSMART Switzerland Andreasstrasse 5 8050 Zurich (Switzerland)ucm@buildingsmart.ch
Company
HomeAbout usCommunityTraining
Resources
Use casesCo-creation spaceRelease notesFAQ
buildingSMART Logo
Copyright © 2026 buildingSMART. All rights reserved.
v5.0.0ContactPrivacy and Cookie StatementTerms and Conditions
Small IconAI Chat
  • Language
  • Maturity Grad
  • Document type
  • Sector
  • Organizations
  • bSI Domains
  • bS Chapter

Legend

Colors
    • Proven
    • Example
    • Outlook
Symbols
    IDMIDM
    Use CaseUse Case
    Case StudyCase Study
    GuidelineGuideline
    StandardStandard
    Technical reportTechnical report
    White paperWhite paper
Title & document type
Last changed
Maturity
Where
Last changed
Use Cases List
Decision-making for residential building renovation
Use Case|Maturity: Proven|en|Last changed: Nov 3, 2022
Proven
en
Nov 3, 2022

Use Case Summary

This use case supports the selection of suitable renovation solutions in the context of residential buildings. It enables stakeholders to define general objectives, establish the criteria to evaluate multiple alternatives, capture the preferences of diverse stakeholders involved in the decision, and to obtain a final ranking of the alternatives according to their performance on the multiple criteria. The use case relies on the Pairwise comparison and TOPSIS methods.

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
-
Project Status
Approved
Maturity Level
Proven
Published on
Nov 3, 2022
Last Change
Nov 3, 2022
Publisher
Horizon Europe
Authors
  • Jerson Alexis Pinzon Amorocho
Open
Use Cases List
3D Gebäudekomplexe für das kantonale GIS
Use Case|Maturity: Outlook|de|Last changed: Oct 27, 2022
Outlook
de
Oct 27, 2022

Use Case Summary

Die kantonale GIS repräsentieren räumliche Referenzdaten und entwickeln sich zunehmend in die dritte Dimension. Bislang werden nur oberirdische Gebäude angeboten, welche fotogrammetrisch entstanden sind. Die inneren und unterirdischen Bestandteile davon (Keller, Einstellhalle, Erschliessung, etc.) befinden sich nicht darunter. Im Sinne von nachhaltigem, hochgenauem und vollständigem Gebäude werden sie künftig ab der Baueingabe und später analog der Baubewilligung im GIS ab IFC dargestellt.

Document Type
Use Case
Life Cycle Stage
bSI Phasen
Revision
V1.0.0.0
Project Status
WIP
Maturity Level
Outlook
Published on
Oct 27, 2022
Last Change
Oct 27, 2022
Publisher
buildingSMART Switzerland
Authors
  • Marc Pancera
  • Patrick Reimann
Open
Use Cases List
Model Checks for compliance testing and design coordination
Use Case|Maturity: Outlook|en|Last changed: Sep 2, 2022
Outlook
en
Sep 2, 2022

Use Case Summary

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
-
Project Status
Approved
Maturity Level
Outlook
Published on
Aug 31, 2022
Last Change
Sep 2, 2022
Publisher
Horizon Europe
Authors
  • Jessica Kathrin Steinjan
Open
Use Cases List
Retrieving BIM data for acoustic comfort calculation
Use Case|Maturity: Outlook|en|Last changed: Sep 1, 2022
Outlook
en
Sep 1, 2022

Use Case Summary

Ifc4AcousticParserService

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
-
Project Status
Approved
Maturity Level
Outlook
Published on
Aug 31, 2022
Last Change
Sep 1, 2022
Publisher
Horizon Europe
Authors
  • Sonia Álvarez-Díaz
Open
Use Cases List
Determination of Stakeholder's BIM Maturity
Use Case|Maturity: Outlook|en|Last changed: Sep 1, 2022
Outlook
en
Sep 1, 2022

Use Case Summary

This document describes “Determine stakeholders' BIM Maturity” use case which is implemented as part of BIM-SPEED EU Horizon2020 project, under grant agreement No. 820553, using the BIM Maturity Tool. The use case provides a procedure which aims to give guidance to stakeholders regarding BIM implementation in renovation projects based on their respective level of BIM maturity. This is achieved through an online tool that guides the stakeholders to BIM use cases that are tailored to their respective level of BIM maturity.

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
-
Project Status
Approved
Maturity Level
Outlook
Published on
Aug 31, 2022
Last Change
Sep 1, 2022
Publisher
Horizon Europe
Authors
  • Josephine Cooke
Open
Use Cases List
Clash Detection
Use Case|Maturity: Outlook|en|Last changed: Sep 1, 2022
Outlook
en
Sep 1, 2022

Use Case Summary

Clash detection is a procedure for detecting geometrical collisions between different disciplines and BIM models. It is an automated process where two or more models can be checked for these collisions using specified rules and tolerances.

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
-
Project Status
Approved
Maturity Level
Outlook
Published on
Aug 31, 2022
Last Change
Sep 1, 2022
Publisher
Horizon Europe
Authors
  • Chris Kowal Kowal
  • Marcin Grzelak
Open
Use Cases List
Existing building Data collection and download based on IFC model definition (BACN2BIM)
Use Case|Maturity: Outlook|en|Last changed: Sep 1, 2022
Outlook
en
Sep 1, 2022

Use Case Summary

Tool for creating monitoring projects in the BIM-SPEED platform

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
-
Project Status
Approved
Maturity Level
Outlook
Published on
Aug 31, 2022
Last Change
Sep 1, 2022
Publisher
Horizon Europe
Authors
  • Sonia Álvarez-Díaz
Open
Use Cases List
Crowd Data Collection
Use Case|Maturity: Outlook|en|Last changed: Sep 1, 2022
Outlook
en
Sep 1, 2022

Use Case Summary

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
-
Project Status
Approved
Maturity Level
Outlook
Published on
Aug 31, 2022
Last Change
Sep 1, 2022
Publisher
Horizon Europe
Authors
  • Sama Rezvani
Open
Use Cases List
Gebruik van de Dalux plugin voor modelleersoftware
Standard|Maturity: Outlook|nl|Last changed: Jul 4, 2022
Outlook
nl
Jul 4, 2022

Use Case Summary

Als modellerende partijen werken met software zoals Archicad of Revit, dan is er de mogelijkheid middels een plugin direct vanuit de modelleersoftware 3D modellen en 2D tekeningen te uploaden naar Dalux.

Document Type
Standard
Life Cycle Stage
-
Revision
-
Project Status
Proposal
Maturity Level
Outlook
Published on
Jun 29, 2022
Last Change
Jul 4, 2022
Publisher
buildingSMART Benelux
Authors
  • Lex Ransijn
Open
Use Cases List
Pointcloud omgeving positioneren op 0-punt project
Case Study|Maturity: Outlook|nl|Last changed: Jun 29, 2022
Outlook
nl
Jun 29, 2022

Use Case Summary

Document Type
Case Study
Life Cycle Stage
-
Revision
-
Project Status
Draft
Maturity Level
Outlook
Published on
Jun 29, 2022
Last Change
Jun 29, 2022
Publisher
buildingSMART Benelux
Authors
  • Lex Ransijn
Open
1...89101112...16