UCM buildingSMART International Logo
  • Keine Ergebnisse gefunden
  • Anwendungsfälle
  • Co-Creation Space
  • Community
    • buildingSMART
      • buildingSMART International
      • buildingSMART Österreich
      • buildingSMART Benelux
      • buildingSMART Deutschland
      • buildingSMART Schweiz
    • Organisationen
      • HSLU
    • Kooperationspartner
      • Unternehmen
      • Verbände & Institutionen
      • Experten
  • de
    • en
    • de
    • fr
  • Anmelden
Standort
buildingSMART Schweiz Andreasstrasse 5 8050 Zürich (Schweiz)ucm@buildingsmart.ch
Unternehmen
StartseiteÜber unsCommunitySchulung
Ressourcen
AnwendungsfälleCo-Creation SpaceVersionshinweiseFAQ
buildingSMART Logo
Copyright © 2025 buildingSMART. Alle Rechte vorbehalten.
v5.0.0KontaktDatenschutz- und Cookie-ErklärungAllgemeine Geschäftsbedingungen
Small IconAI Chat

    Reinforcement modeling

    Kommentare

    Kommentare werden geladen...

    NOCH NICHT REGISTRIERT?


    Registrieren Sie sich für den Use Case Management Service kostenlos, um Ihren ersten Use Case zu erstellen.


    Registrierte Benutzer können den Download-Bereich und die Kommentarfunktionen nutzen.

    Reinforcement modeling
    Dokumenttyp
    Anwendungsfall
    GUID
    2CD3B61A-674D-4019-9404-490FB4EF9C50
    Kennung
    -
    Lebenszyklusphase
    HOAI
    Revision
    -
    Projektstatus
    Entwurf
    Reifegrad
    Beispiel
    Veröffentlicht am
    25. Nov. 2021
    Letzte Änderung
    25. Nov. 2021
    Herausgeber
    buildingSMART Germany
    Autoren
    -
    Startseite
    Anwendungsfälle
    Reinforcement modeling

    Anwendungsfall Dokumentdefinition

    Austauschanforderungen

    Impressum

    Partner

    Urheberrecht

    All dokuments are licensed as a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License
    (Attribution-Non-Commercial-ShareAlike 4.0). Further information can be found at

    creativecommons

    Handhabung

    The documents reflect the current best practice and do not claim to be complete. They should not to be understood in the sense of a generally valid recommendation or guideline from a legal point of view. The documents are intended to support appointing and appointed parties in the application of the BIM method. The documents must be adapted to the specific project requirements in each case. The examples listed do not claim to be complete. Its information is based on findings from practical experience and is accordingly to be understood as best practice and not universally applicable. Since we are in a phase in which definitions are only emerging, the publisher cannot guarantee the correctness of individual contents.

    Beschreibung

    Two essential bases are required for the design of reinforcement in reinforced concrete:
    The exact geometry of the structure to be executed with recesses and built-in parts (formwork dimensions), and the structural analysis (see Section 4), which, in addition to design information (e.g. maximum bar diameters or minimum spacing), includes the statically required amount of reinforcement for each component and its distribution.
    The reinforcement model is modeled as an independent structural design model. 
    A structural model is used as the model basis from which the formwork plans can be derived. This formwork model, if you want to call it that, must fulfill both the geometric (LOG) and attributive requirements (LOI) necessary for accurate execution planning.
    The reinforcement model created with a BIM authoring tool is then used in the subsequent BIM processes for quality assurance, coordination, quantity takeoff and can also serve as the basis for the automated creation of reinforcement components in prefabrication.

    Lebenszyklusphasen

    HOAI