Logo UCM buildingSMART International
  • Aucun résultat trouvé
  • Cas d'utilisation
  • Co-Creation Space
  • Communauté
    • buildingSMART
      • buildingSMART International
      • buildingSMART Autriche
      • buildingSMART Benelux
      • buildingSMART Allemagne
      • buildingSMART Switzerland
    • Organisations
      • HSLU
    • Partenaires de collaboration
      • Entreprises
      • Associations & Institutions
      • Expert
  • fr
    • en
    • de
    • fr
  • Connexion
Emplacement
buildingSMART Switzerland Andreasstrasse 5 8050 Zurich (Switzerland)ucm@buildingsmart.ch
Société
AccueilÀ proposCommunautéFormation
Ressources
Cas d'utilisationCo-creation spaceNotes de versionFAQ
buildingSMART Logo
Copyright © 2025 buildingSMART. Tous droits réservés.
v5.0.0ContactDéclaration de confidentialité et de cookiesTermes et conditions
Small IconAI Chat

    Reinforcement modeling

    Commentaires

    Chargement des commentaires...

    PAS ENCORE INSCRIT?


    Inscrivez-vous au Service de Gestion des Cas d'Utilisation gratuitement pour commencer à créer votre premier cas d'utilisation.


    Les utilisateurs inscrits peuvent utiliser la zone de téléchargement et les fonctions de commentaire.

    Reinforcement modeling
    Type de Document
    Cas d'utilisation
    GUID
    2CD3B61A-674D-4019-9404-490FB4EF9C50
    Identifiant
    -
    Phase du Cycle de Vie
    HOAI
    Révision
    -
    Statut du Projet
    Brouillon
    Niveau de Maturité
    Exemple
    Publié le
    25 nov. 2021
    Dernière Modification
    25 nov. 2021
    Éditeur
    buildingSMART Germany
    Auteurs
    -
    Accueil
    Cas d'utilisation
    Reinforcement modeling

    Cas d'utilisation Définition du Document

    Exigences d'échange

    Impression

    Partenaires

    Droits d'auteur

    All dokuments are licensed as a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License
    (Attribution-Non-Commercial-ShareAlike 4.0). Further information can be found at

    creativecommons

    Manipulation

    The documents reflect the current best practice and do not claim to be complete. They should not to be understood in the sense of a generally valid recommendation or guideline from a legal point of view. The documents are intended to support appointing and appointed parties in the application of the BIM method. The documents must be adapted to the specific project requirements in each case. The examples listed do not claim to be complete. Its information is based on findings from practical experience and is accordingly to be understood as best practice and not universally applicable. Since we are in a phase in which definitions are only emerging, the publisher cannot guarantee the correctness of individual contents.

    Description

    Two essential bases are required for the design of reinforcement in reinforced concrete:
    The exact geometry of the structure to be executed with recesses and built-in parts (formwork dimensions), and the structural analysis (see Section 4), which, in addition to design information (e.g. maximum bar diameters or minimum spacing), includes the statically required amount of reinforcement for each component and its distribution.
    The reinforcement model is modeled as an independent structural design model. 
    A structural model is used as the model basis from which the formwork plans can be derived. This formwork model, if you want to call it that, must fulfill both the geometric (LOG) and attributive requirements (LOI) necessary for accurate execution planning.
    The reinforcement model created with a BIM authoring tool is then used in the subsequent BIM processes for quality assurance, coordination, quantity takeoff and can also serve as the basis for the automated creation of reinforcement components in prefabrication.

    Phases du Cycle de Vie

    HOAI