The Building Programming is a central component of BIM planning across all project phases. Any relevant information is collected in one place and can be viewed, edited, managed and evaluated by the project team.
The Building Programming is model-based and merges information from different sources and formats over open interfaces. Each project participant is provided with specific permissions and an agile and tailored view of the project. This requires a coordinated information and naming convention. Furthermore, an underlying organizational structure in the form of an online-based, normalized database is mandatory. Additional information as qualities, room categories, requirements, material qualities, equipment lists, etc. should also be displayed.
The Building Programming not only makes planning coordination more transparent and easier. It is also a platform that is interacting with many other use cases of the creation and delivery phase. Usages and instruments such as evaluations, tenders, LEAN and logistics planning and acceptance are based on structured spatial data. It should be possible to bring builders and engineers closer to the project and to provide a basis for better decisions. Finally, a smooth transfer to Facility Management should be ensured by a smart interface.
Included:
Phase-independent during planning and execution
Independent to software
All room information in structured form
Preparation for hand-over and Facility Management
Not included:
Building element catalogue
Coordination of medias
The Building Programming should help in the pre-project to find an optimal structural solution. In early project phases it is of central importance to be able to make well-founded statements on utilization, area and volume ratios. A Building Programming should contribute to the fact that key figures can be derived and compared with the required space program.
Variant studies should be made comparable and serve as a basis for decisions.
In SIA phase 32, the Building Programming should help the planners to optimize the project. It serves as an aid to meet all requirements of the builder owner.
Room numbers and room types must be defined, as any other information is depending on it
All information crucial for the room must be stored and displayed without redundancy. Planning results of each technical discipline should be displayed in the Building Programming.
For each room, all associated elements, such as doors, appliances or equipment elements should be assigned.
The client should have access to the Building Programming and be able to compare the planning results with his requirements.
All information crucial for the room must be displayed and stored without redundancy. Planning results of each technical discipline should be displayed in the Building Programming.
For each room, relevant elements such as doors, appliances and equipment should be assigned.
The client should have access to the Building Programming and be able to compare the planning results with his requirements.
The Building Programming should support the announcement in such a way that all relevant quantities and qualities of surfaces can be derived from the rooms.
In addition, room sheets must be generated automatically and should consist of all necessary information. The handover to the client takes place at the end of the phase as a data drop
All information crucial for the room must be displayed, stored without redundancy and displayed. Planning results of each discipline should be displayed in the Building Programming.
For each room, relevant elements such as doors, appliances and equipment should be assigned.
The client should be able to look into the Building Programming and be able to compare the planning results with his requirements.
The Building Programming should support the execution planning in such a way that all relevant quantities and qualities of surfaces can be derived from the rooms.
In addition, room sheets must be generated automatically, which have all the necessary information. The handover to the client takes place at the end of the phase as a data drop.
Based on the Building Programming, the results of the execution as a construction journal are to be documented based on space.
Construction pace simulations should be able to be derived from the Building Programming.
Optionally, the Building Programming can be used to consider time zones according to LEAN planning.
All information relevant to the FM from the Building Programming must be filtered and handed over in a coordinated form.
The use cases reflect the current best practice do not claim to be complete. Use cases shall be understood in the sense of a generally accepted recommendation or guideline from a legal point of view, but rather to support the client and contractor in the application of the BIM method. The use cases must be adapted to the specific project requirements. The examples listed here are not exhaustive. Information is based on real-world insights and is therefore to be understood as best practice and not universally valid. Since we are in a phase where definitions are only emerging, Bauen digital Schweiz can not guarantee the accuracy of individual content.