Logo UCM buildingSMART International
  • Aucun résultat trouvé
  • Cas d'utilisation
  • Co-Creation Space
  • Communauté
    • buildingSMART
      • buildingSMART International
      • buildingSMART Autriche
      • buildingSMART Benelux
      • buildingSMART Allemagne
      • buildingSMART Switzerland
    • Organisations
      • HSLU
    • Partenaires de collaboration
      • Entreprises
      • Associations & Institutions
      • Expert
  • fr
    • en
    • de
    • fr
  • Connexion
Emplacement
buildingSMART Switzerland Andreasstrasse 5 8050 Zurich (Switzerland)ucm@buildingsmart.ch
Société
AccueilÀ proposCommunautéFormation
Ressources
Cas d'utilisationCo-creation spaceNotes de versionFAQ
buildingSMART Logo
Copyright © 2025 buildingSMART. Tous droits réservés.
ContactDéclaration de confidentialité et de cookiesTermes et conditions
Small IconAI Chat

    Building Programming in Design and Construction

    Commentaires

    Chargement des commentaires...

    PAS ENCORE INSCRIT?


    Inscrivez-vous au Service de Gestion des Cas d'Utilisation gratuitement pour commencer à créer votre premier cas d'utilisation.


    Les utilisateurs inscrits peuvent utiliser la zone de téléchargement et les fonctions de commentaire.

    Building Programming in Design and Construction
    Type de Document
    Cas d'utilisation
    GUID
    A977654C-C53D-40AC-A4E8-B9FE95A5A393
    Identifiant
    -
    Phase du Cycle de Vie
    SIA 112
    Révision
    Rev 1.1
    Statut du Projet
    Brouillon
    Niveau de Maturité
    Perspective
    Publié le
    9 janv. 2020
    Dernière Modification
    9 janv. 2020
    Éditeur
    buildingSMART Switzerland
    Auteurs
    • Julian Amann
    Accueil
    Cas d'utilisation
    Building Programming in Design and Construction

    Cas d'utilisation Définition du Document

    Exigences d'échange

    Impression

    Groupe de Projet

    • Julian Amann (Singular)
    • Klaus Hyden (IE Industrial Engineering Zürich AG)
    • Marco Kessler (Dachtler Partner AG Architekten)
    • Matthias Liechti (HHM)
    • Anne Nyffeler (PIRMIN JUNG Schweiz AG)
    • Martin Peiner (Henauer Gugler AG)

    Partenaires

    Droits d'auteur

    Ce travail est sous licence Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License (Attribution-Non-Commercial-ShareAlike 4.0). Plus d'informations peuvent être trouvées sur http://creativecommons.org/licenses/by-nc-sa/4.0/

    Manipulation

    The use cases reflect the current best practice do not claim to be complete. Use cases shall be understood in the sense of a generally accepted recommendation or guideline from a legal point of view, but rather to support the client and contractor in the application of the BIM method. The use cases must be adapted to the specific project requirements. The examples listed here are not exhaustive. Information is based on real-world insights and is therefore to be understood as best practice and not universally valid. Since we are in a phase where definitions are only emerging, Bauen digital Schweiz can not guarantee the accuracy of individual content.


    Objectif et Portée

    • Availability of all information for the entire planning team
    • Datadrop for the building contractor
    • Status comparison
    • Checking level of competition
    • Management of planning results
    • Support of requirement management
    • Coordination and consolidation of room specific requirements
    • Generation of documentation (room- and type leaf’s)
    • Control read / write access per access
    • Reporting of project progress

    Description

    The Building Programming is a central component of BIM planning across all project phases. Any relevant information is collected in one place and can be viewed, edited, managed and evaluated by the project team.
    The Building Programming is model-based and merges information from different sources and formats over open interfaces. Each project participant is provided with specific permissions and an agile and tailored view of the project. This requires a coordinated information and naming convention. Furthermore, an underlying organizational structure in the form of an online-based, normalized database is mandatory. Additional information as qualities, room categories, requirements, material qualities, equipment lists, etc. should also be displayed.
    The Building Programming not only makes planning coordination more transparent and easier. It is also a platform that is interacting with many other use cases of the creation and delivery phase. Usages and instruments such as evaluations, tenders, LEAN and logistics planning and acceptance are based on structured spatial data. It should be possible to bring builders and engineers closer to the project and to provide a basis for better decisions. Finally, a smooth transfer to Facility Management should be ensured by a smart interface.


    Phases du Cycle de Vie

    SIA 112

    Objectifs & Avantages du BIM

    • Active management and coordination of all relevant information at the spatial level
    • Single Source of Truth for all data
    • Common data environment to data processing
    • Joint workspace, anyone works on same platform
    • Traceability of responsibilities
    • Building Programming automatically generated

    Délimitation

    Included:
    Phase-independent during planning and execution
    Independent to software
    All room information in structured form
    Preparation for hand-over and Facility Management
    Not included:
    Building element catalogue
    Coordination of medias


    Conditions Préalables / Cadre

    • BIM Execution Plan
    • Harmonized room designation and room numeration
    • Central data model
    • Typing
    • Consolidated planning processes
    • Model based generation of rooms
    • Element plan including definition of attributes
    • Clarification with requirements to Facility Management

    Processus

    Diagramme de Processus

    SIA 112

    31 | Concept Design

    The Building Programming should help in the pre-project to find an optimal structural solution. In early project phases it is of central importance to be able to make well-founded statements on utilization, area and volume ratios. A Building Programming should contribute to the fact that key figures can be derived and compared with the required space program.
    Variant studies should be made comparable and serve as a basis for decisions.


    UseCases.Details.Definition.PerformanceRequirement
    • Figure room program acc. requirement
    • Comparison of areas (target / actual)
    • Project reporting
    • Basis for decisions
    • Compliance with area codes acc. regulatory requirements
      Optional:
    • Planning accompanying Facility Management
    32 | Detail Design

    In SIA phase 32, the Building Programming should help the planners to optimize the project. It serves as an aid to meet all requirements of the builder owner.
    Room numbers and room types must be defined, as any other information is depending on it
    All information crucial for the room must be stored and displayed without redundancy. Planning results of each technical discipline should be displayed in the Building Programming.
    For each room, all associated elements, such as doors, appliances or equipment elements should be assigned.
    The client should have access to the Building Programming and be able to compare the planning results with his requirements.


    UseCases.Details.Definition.PerformanceRequirement
    • Quality of materials
    • Numbering of space
    • Room typing / room categories
    • Generation of room type sheets
    • Assigned requirements acc. client (statics, personal occupancy, building physics, quality, etc)
    • Comparison requirement with planning status
    • Complete list of equipment (appliances, electrical installations, etc)
    • Linked doors + windows
    • Illustration of zones (safety planning, fire protection, building services, operation, etc)
      optional:
    • Planning accompanying Facility Management
    41 | Offer Comparison

    All information crucial for the room must be displayed and stored without redundancy. Planning results of each technical discipline should be displayed in the Building Programming.
    For each room, relevant elements such as doors, appliances and equipment should be assigned.
    The client should have access to the Building Programming and be able to compare the planning results with his requirements.
    The Building Programming should support the announcement in such a way that all relevant quantities and qualities of surfaces can be derived from the rooms.
    In addition, room sheets must be generated automatically and should consist of all necessary information. The handover to the client takes place at the end of the phase as a data drop


    UseCases.Details.Definition.PerformanceRequirement
    • Quality of materials
    • Numbering of space
    • Room typing
    • Room Categories
    • Assigned requirements acc. client (statics, personal occupancy, building physics, quality, etc)
    • Comparison of requirement with planned (planning values vs. performance values)
    • Linked equipment -> equipment list
    • Linked doors
    • Illustration of zones (safety planning, fire protection, building services, operation, etc)
    • Generation of room type sheets
    • Generation of room sheets
    • Quality and mass surfaces from space
      optional:
      Planning accompanying Facility Management
    51 | Construction Design

    All information crucial for the room must be displayed, stored without redundancy and displayed. Planning results of each discipline should be displayed in the Building Programming.
    For each room, relevant elements such as doors, appliances and equipment should be assigned.
    The client should be able to look into the Building Programming and be able to compare the planning results with his requirements.
    The Building Programming should support the execution planning in such a way that all relevant quantities and qualities of surfaces can be derived from the rooms.
    In addition, room sheets must be generated automatically, which have all the necessary information. The handover to the client takes place at the end of the phase as a data drop.


    UseCases.Details.Definition.PerformanceRequirement
    • Quality of materials
    • Numbering of space
    • Room typing / room categories
    • Assigned requirements acc. client (statics, occupancy, building physics, quality, etc)
    • Comparison requirement with planned
    • Linked equipment -> equipment list
    • Linked doors
    • Illustration of zones (safety planning, fire protection, building services, operation, etc)
    • Generation of room type sheets
    • Generation of room sheets
    • Quality and mass surfaces from space
      optional:
    • Planning accompanying Facility Management
    • Progress simulation of construction
    • Support logistics planning
    • Support LEAN
    52 | Construction

    Based on the Building Programming, the results of the execution as a construction journal are to be documented based on space.
    Construction pace simulations should be able to be derived from the Building Programming.
    Optionally, the Building Programming can be used to consider time zones according to LEAN planning.


    UseCases.Details.Definition.PerformanceRequirement
    • Results Execution / construction journal
    • Room based decrease
    • Defect management
      optional:
    • Support logistics planning
    • Support LEAN
    • Planning accompanying Facility Management
    53 | Commission Phase

    All information relevant to the FM from the Building Programming must be filtered and handed over in a coordinated form.


    UseCases.Details.Definition.PerformanceRequirement
    • Space-based quality management
    • Room based acceptance
    • Defect management
    • Facility Management areas
    • Information about maintenance
    • Zones (safety planning, fire protection, building services, operation, etc)
      optional
    • Operational concept
    • Conversion status