In order to plan buildings compliant with respect to occupants' safety, performance-based analysis of the design can be conducted. For that, crowd simulations can be applied. These simulations are used to check whether performance indicators are fulfilled and the building is compliant.
To perform such analysis automatically, the model has to provide specific information on top of geometric information. For that, the IFC standard has to be extended. The key actors on this project are the Fire Safety Expert, the Simulation Expert as well as the AHJ (Authorities Having Jurisdiction).
The aim of this project is to perform this kind of analysis throughout the design phase in a repetitive manner to enhance the overall planning process.
Document Type
Use Case
GUID
2143B7DE-F857-48D7-A15B-431C1D9925AB
Identifier
-
Life Cycle Stage
-
Revision
V1.0.0.0
Project Status
Approved
Maturity level
Example
Use Case
Approved
Processes
Approved
ER
Approved
Publisher
buildingSMART International
Author
Abualdenien, Jimmy | Kneidl, Angelika | Lawrence, Peter | Lehtoviita, Timo | Siddiqui, Asim | Thompson, Peter
Use case for building evacuation analysis using RIBA stages.
Document Type
Use Case
GUID
CCEB0BA5-0E8F-4CA2-80E5-B6CF856BA003
Identifier
OMA-EVAC-RIBA
Life Cycle Stage
-
Revision
V1.1.1.0
Project Status
Approved
Maturity level
Example
Use Case
Draft
Processes
Draft
ER
Draft
Publisher
buildingSMART International
Author
Abualdenien, Jimmy | Kneidl, Angelika | Lawrence, Peter | Lehtoviita, Timo | Siddiqui, Asim | Thompson, Peter
Page 1 of 1 | Entries 1 - 3 of 3