UCM buildingSMART International Logo
  • No results found
  • Use cases
  • Co-Creation Space
  • Community
    • buildingSMART
      • buildingSMART International
      • buildingSMART Austria
      • buildingSMART Benelux
      • buildingSMART Germany
      • buildingSMART Switzerland
    • Organizations
      • HSLU
    • Collaboration Partners
      • Companies
      • Associations & Institutions
  • en
    • en
    • de
    • fr
  • Login
Location
buildingSMART Switzerland Andreasstrasse 5 8050 Zurich (Switzerland)ucm@buildingsmart.ch
Company
HomeAbout usCommunityTraining
Resources
Use casesCo-creation spaceRelease notesFAQ
buildingSMART Logo
Copyright © 2026 buildingSMART. All rights reserved.
v5.0.0ContactPrivacy and Cookie StatementTerms and Conditions
Small IconAI Chat
  • Language
  • Maturity Grad
  • Document type
  • Sector
  • Organizations
  • bSI Domains
  • bS Chapter

Legend

Colors
    • Proven
    • Example
    • Outlook
Symbols
    IDMIDM
    Use CaseUse Case
    Case StudyCase Study
    GuidelineGuideline
    StandardStandard
    Technical reportTechnical report
    White paperWhite paper
Title & document type
Last changed
Maturity
Where
Last changed
Use Cases List
Evacuation Analysis - International
Use Case|Maturity: Example|en|Last changed: Nov 4, 2024
Example
en
Nov 4, 2024

Use Case Summary

Use case for building evacuation analysis that is applicable to multiple countries, such as Germany and the United States.

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
V1.1.0
Project Status
Approved
Maturity Level
Example
Published on
Dec 6, 2021
Last Change
Nov 4, 2024
Publisher
buildingSMART International
Authors
  • Angelika Kneidl
  • Asim Siddiqui
  • Jimmy Abualdenien
  • Peter Lawrence
  • Rainer Könnecke
  • Timo Lehtoviita
Open
Use Cases List
openBIM & Sustainability: Unveiling Challenges, Crafting Solutions for a Sustainable Built Asset Industry
Information Delivery Manual|Maturity: Example|en|Last changed: Sep 27, 2024
Example
en
Sep 27, 2024

Use Case Summary

In the built asset industry, sustainability is a multifaceted challenge that requires careful evaluation of environmental, social, and economic aspects across a project's life cycle. This report explores how openBIM and buildingSMART standards can enhance sustainability practices within the industry. It outlines the objectives, challenges, and solutions identified by a strategic group of industry experts. The report concludes with recommendations and next steps for further refining and implementing these strategies in real-world scenarios.

Document Type
Information Delivery Manual
Life Cycle Stage
bSI Phases
Revision
0.1
Project Status
Approved
Maturity Level
Example
Published on
Aug 23, 2024
Last Change
Sep 27, 2024
Publisher
buildingSMART International
Authors
  • Alicja Brachaczek
  • Artur Tomczak
  • Céline Bent
  • David Fürstenberg
  • Eduard Dischke
  • Hansueli Schmid
  • Jakob Beetz
  • Jan-Anders Jönsson
  • Jörg Ziolkowski
  • Katja Malovrh Rebec
  • Louis Casteleyn
  • Mahshid Motie
  • Matthew Jackson
  • Menno Mekes
  • Mirbek Neumann
  • Nicholas Nisbet
Open
Use Cases List
Urban Mining: Decommissioning to Reuse (D2R)
Information Delivery Manual|Maturity: Outlook|en|Last changed: Sep 15, 2024
Outlook
en
Sep 15, 2024

Use Case Summary

Document Type
Information Delivery Manual
Life Cycle Stage
Generic Stages
Revision
-
Project Status
Draft
Maturity Level
Outlook
Published on
Sep 10, 2024
Last Change
Sep 15, 2024
Publisher
buildingSMART Benelux
Authors
  • Arghavan Akbarieh
Open
Use Cases List
Thermische Gebäudesimulation in der Planungsphase
Use Case|Maturity: Example|de|Last changed: Aug 28, 2024
Example
de
Aug 28, 2024

Use Case Summary

Document Type
Use Case
Life Cycle Stage
ÖNORM
Revision
1.0.2
Project Status
Approved
Maturity Level
Example
Published on
Aug 28, 2024
Last Change
Aug 28, 2024
Publisher
buildingSMART Austria
Authors
  • David Ziermann
  • Gumhalter, Michael
  • Moser, Christoph
  • Partl, Rainer
Open
Use Cases List
Signal Visibility Check
bSI Award|Maturity: Example|en|Last changed: Jun 3, 2024
Example
en
Jun 3, 2024

Use Case Summary

Document Type
bSI Award
Life Cycle Stage
-
Revision
V1.0.0
Project Status
Approved
Maturity Level
Example
Published on
Jun 3, 2024
Last Change
Jun 3, 2024
Publisher
buildingSMART China
Authors
  • Huaisong WANG
Open
Use Cases List
IFC-basierte Modellübergabe an Stahlbauer
Use Case|Maturity: Outlook|de|Last changed: May 16, 2024
Outlook
de
May 16, 2024

Use Case Summary

Dieser Anwendungsfall beschreibt den Austausch von Informationen und IFC-Modellen, die zum Zeitpunkt der Auftragsvergabe vom Auftraggeber an den Hersteller der Stahlkonstruktion zu übergeben sind (entspricht dem Begriff Ausführungsunterlagen, wie z. B. Ausführungspläne, Leistungsverzeichnisse, Statiken).

Document Type
Use Case
Life Cycle Stage
HOAI
Revision
-
Project Status
WIP
Maturity Level
Outlook
Published on
Jan 30, 2024
Last Change
May 16, 2024
Publisher
buildingSMART Germany
Authors
  • André Bubner
  • Daniel Rückwardt
  • Kocker Ronald
  • Mirbek Neumann
  • Sharan Vijayagopal
  • Ursel Jansen
  • Vitalij Frank
Open
Use Cases List
IFC for Ports & Waterways
Standard|Maturity: Proven|en|Last changed: Apr 12, 2024
Proven
en
Apr 12, 2024

Use Case Summary

openBIM standards for the domain of Ports & Waterways

Document Type
Standard
Life Cycle Stage
-
Revision
V1.1.0
Project Status
Approved
Maturity Level
Proven
Published on
Jan 26, 2023
Last Change
Apr 12, 2024
Publisher
buildingSMART International
Authors
  • Binesmael Mohamed
  • Bower Thomas
  • Bradley Alex
  • Greatrix Mark
  • Jiang Shaohua
  • Jon Proctor
  • Khudhair Ali
  • Kluge Michael
  • Krijgym Fleurike
  • Li Haijiang
  • Liu Song
  • Moss Kyle
  • Nisbet Nicholas
  • Peel Daniel
  • Qin Honglei
  • Ramsay Mike
  • Ren Guoqian
  • Ren Guoqian
  • Ruby-Lewis Veronica
  • Smith Jack
  • Tian Zhong
  • Vaessen-Mol Laura
  • Wang Yi
  • Weidt Maik
  • Wen Xi
  • Wissel Julia
  • Zhu Xiaofeng
Open
Use Cases List
Modellbasierte Performance Optimierung (MPO)
Use Case|Maturity: Example|de|Last changed: Mar 20, 2024
Example
de
Mar 20, 2024

Use Case Summary

Exakte und Leistungsoptimierte Planung von Gebäudetechnik dank Simulationen

Document Type
Use Case
Life Cycle Stage
SIA 112
Revision
V1.0.0.5
Project Status
Approved
Maturity Level
Example
Published on
Oct 30, 2020
Last Change
Mar 20, 2024
Publisher
buildingSMART Switzerland
Authors
  • Moritz Meier, Amstein + Walthert AG
  • Valentina Zanotto, Amstein + Walthert AG
Open
Use Cases List
Optimisation de performance s’appuyant sur un modèle (OPM)
Use Case|Maturity: Example|fr|Last changed: Mar 20, 2024
Example
fr
Mar 20, 2024

Use Case Summary

Dimensionnement exact des installations techniques d'un bâtiment, optimisé en fonction des performances grâce à des simulations.

Document Type
Use Case
Life Cycle Stage
SIA 112
Revision
V1.0.0.5
Project Status
Approved
Maturity Level
Example
Published on
Nov 30, 2020
Last Change
Mar 20, 2024
Publisher
buildingSMART Switzerland
Authors
-
Open
Use Cases List
Brandschutzplanung für Baubewilligung
Use Case|Maturity: Outlook|de|Last changed: Mar 12, 2024
Outlook
de
Mar 12, 2024

Use Case Summary

Document Type
Use Case
Life Cycle Stage
Generische Phasen
Revision
V1.0.1
Project Status
Draft
Maturity Level
Outlook
Published on
Mar 16, 2020
Last Change
Mar 12, 2024
Publisher
buildingSMART Switzerland
Authors
  • Anne Nyffeler
  • Evelyne Jost
  • Marc Pancera
  • Stefan Arnaldi
  • Urs Käser
Open
1...45678...16