Use Case Summary
Leitfaden für die Projektabwicklung
Leitfaden für die Projektabwicklung
Produktion und Realisierung mit BIM der Gebäudehülle inkl. Dach sowie Umgebung
openBIM for Daylighting Design & Analyses in respect for Energy Efficiency of New and Existing Buildings. This Method was used in various past projects like Meffert AG Social Facilities Building in Bad Kreuznach, Germany; New Single Family Home in Gau-Bickelheim, Germany; Existing Single Family Home in Höhr-Grenzhausen, Germany; Pilgrim+ Containerized Low-Energy Building Project in Ankara, Türkiye; Energy Efficiency and Climate Change Awareness Center in Ankara, Türkiye etc.
The ROS-BIM Project utilizes a dynamic integration between the Robotic Operation System (ROS) and the ifcOWL ontology to enable the automation of digital fabrication using IFC model data. The project's objectives included examining the feasibility of integrating ROS with ifcOWL ontology for digital fabrication automation, developing a workflow for extracting wall geometry data (including openings) from IFC models, and implementing a system for cutting gypsum boards based on standard dimensions. Additionally, the team aimed to simulate and visualize robotic movements and fabrication processes using RVIZ and update the resulting panel geometry on the server as an IfcBuildingElementProxy, labeling them with their fabrication status.
Use case of CBIMS Manager and Knowledge Base in Shenzhen Qianhai Xinhua Life Building Project.
Definition einer minimalen gemeinsamen Grundlage für thermische Simulationen
Das Ziel des Use Cases ist es, auf Basis von openBIM Standards (IFC), einen klaren praxisnahen Workflow zu schaffen. Dieser soll vor allem kleinen und mittelständigen Unternehmen helfen, die Durchbruchsplanung auf BIM Basis effektiv durchzuführen. IFC4: IfcBuildingElementProxyTypeEnum.PROVISIONFORVOID IFC4.3: IfcVirtualElementTypeEnum.PROVISIONFORVOID