UCM buildingSMART International Logo
  • No results found
  • Use cases
  • Co-Creation Space
  • Community
    • buildingSMART
      • buildingSMART International
      • buildingSMART Austria
      • buildingSMART Benelux
      • buildingSMART Germany
      • buildingSMART Switzerland
    • Organizations
      • HSLU
    • Collaboration Partners
      • Companies
      • Associations & Institutions
  • en
    • en
    • de
    • fr
  • Login
Location
buildingSMART Switzerland Andreasstrasse 5 8050 Zurich (Switzerland)ucm@buildingsmart.ch
Company
HomeAbout usCommunityTraining
Resources
Use casesCo-creation spaceRelease notesFAQ
buildingSMART Logo
Copyright © 2026 buildingSMART. All rights reserved.
v5.0.0ContactPrivacy and Cookie StatementTerms and Conditions
Small IconAI Chat
Active filters iconActive filters:
Elif Akbas
  • Language
  • Maturity Grad
  • Document type
  • Sector
  • Organizations
  • bSI Domains
  • bS Chapter

Legend

Colors
    • Proven
    • Example
    • Outlook
Symbols
    IDMIDM
    Use CaseUse Case
    Case StudyCase Study
    GuidelineGuideline
    StandardStandard
    Technical reportTechnical report
    White paperWhite paper
Title & document type
Last changed
Maturity
Where
Last changed
Use Cases List
BIM-ROS Integration
Use Case|Maturity: Example|en|Last changed: Jun 27, 2023
Example
en
Jun 27, 2023

Use Case Summary

The ROS-BIM Project utilizes a dynamic integration between the Robotic Operation System (ROS) and the ifcOWL ontology to enable the automation of digital fabrication using IFC model data. The project's objectives included examining the feasibility of integrating ROS with ifcOWL ontology for digital fabrication automation, developing a workflow for extracting wall geometry data (including openings) from IFC models, and implementing a system for cutting gypsum boards based on standard dimensions. Additionally, the team aimed to simulate and visualize robotic movements and fabrication processes using RVIZ and update the resulting panel geometry on the server as an IfcBuildingElementProxy, labeling them with their fabrication status.

Document Type
Use Case
Life Cycle Stage
ISO 22263
Revision
V1.0.1
Project Status
Approved
Maturity Level
Example
Published on
Jun 20, 2023
Last Change
Jun 27, 2023
Publisher
buildingSMART International
Authors
  • Elif Akbas
  • Karaoglan Yazici, Cemre
  • Kaya, Beyzanur
Open
1