UCM buildingSMART International Logo
  • No results found
  • Use cases
  • Co-Creation Space
  • Community
    • buildingSMART
      • buildingSMART International
      • buildingSMART Austria
      • buildingSMART Benelux
      • buildingSMART Germany
      • buildingSMART Switzerland
    • Organizations
      • HSLU
    • Collaboration Partners
      • Companies
      • Associations & Institutions
  • en
    • en
    • de
    • fr
  • Login
Location
buildingSMART Switzerland Andreasstrasse 5 8050 Zurich (Switzerland)ucm@buildingsmart.ch
Company
HomeAbout usCommunityTraining
Resources
Use casesCo-creation spaceRelease notesFAQ
buildingSMART Logo
Copyright © 2026 buildingSMART. All rights reserved.
v5.0.0ContactPrivacy and Cookie StatementTerms and Conditions
Small IconAI Chat
Active filters iconActive filters:
Oliver Lebherz Lebherz
  • Language
  • Maturity Grad
  • Document type
  • Sector
  • Organizations
  • bSI Domains
  • bS Chapter

Legend

Colors
    • Proven
    • Example
    • Outlook
Symbols
    IDMIDM
    Use CaseUse Case
    Case StudyCase Study
    GuidelineGuideline
    StandardStandard
    Technical reportTechnical report
    White paperWhite paper
Title & document type
Last changed
Maturity
Where
Last changed
Use Cases List
UC 2.07 - Collision check and mechanical integration of LV distribution systems in a building model
Use Case|Maturity: Proven|en|Last changed: Jul 2, 2025
Proven
en
Jul 2, 2025

Use Case Summary

Collision check and mechanical integration of low voltage distribution systems in a building model - cf. Attached document for details.

Document Type
Use Case
Life Cycle Stage
bSI Phases
Revision
V1.0.0
Project Status
Approved
Maturity Level
Proven
Published on
Jul 2, 2025
Last Change
Jul 2, 2025
Publisher
buildingSMART International
Authors
  • Andreas Gebele
  • Oliver Lebherz Lebherz
Open
Use Cases List
UC 2.06 - Collision check and mechanical integration of MV distribution systems in a building model
Use Case|Maturity: Proven|en|Last changed: Jul 2, 2025
Proven
en
Jul 2, 2025

Use Case Summary

Collision check and mechanical integration of medium voltage distribution systems in a building model - cf. Attached document for details.

Document Type
Use Case
Life Cycle Stage
bSI Phases
Revision
V1.0.0
Project Status
Approved
Maturity Level
Proven
Published on
Jul 2, 2025
Last Change
Jul 2, 2025
Publisher
buildingSMART International
Authors
  • Andreas Gebele
  • Oliver Lebherz Lebherz
Open
1