UCM buildingSMART International Logo
  • Keine Ergebnisse gefunden
  • Anwendungsfälle
  • Co-Creation Space
  • Community
    • buildingSMART
      • buildingSMART International
      • buildingSMART Österreich
      • buildingSMART Benelux
      • buildingSMART Deutschland
      • buildingSMART Schweiz
    • Organisationen
      • HSLU
    • Kooperationspartner
      • Unternehmen
      • Verbände & Institutionen
      • Experten
  • de
    • en
    • de
    • fr
  • Anmelden
Standort
buildingSMART Schweiz Andreasstrasse 5 8050 Zürich (Schweiz)ucm@buildingsmart.ch
Unternehmen
StartseiteÜber unsCommunitySchulung
Ressourcen
AnwendungsfälleCo-Creation SpaceVersionshinweiseFAQ
buildingSMART Logo
Copyright © 2025 buildingSMART. Alle Rechte vorbehalten.
v5.0.0KontaktDatenschutz- und Cookie-ErklärungAllgemeine Geschäftsbedingungen
Small IconAI Chat

    Retro BIM

    Kommentare

    Kommentare werden geladen...

    NOCH NICHT REGISTRIERT?


    Registrieren Sie sich für den Use Case Management Service kostenlos, um Ihren ersten Use Case zu erstellen.


    Registrierte Benutzer können den Download-Bereich und die Kommentarfunktionen nutzen.

    Retro BIM
    Dokumenttyp
    Anwendungsfall
    GUID
    45ECD0BD-68F1-40FC-A690-2D460DCC0227
    Kennung
    -
    Lebenszyklusphase
    RIBA - plan of work
    Revision
    001
    Projektstatus
    Entwurf
    Reifegrad
    Beispiel
    Veröffentlicht am
    19. Okt. 2019
    Letzte Änderung
    22. Nov. 2019
    Herausgeber
    buildingSMART Switzerland
    Autoren
    • Andreas Netz
    Startseite
    Anwendungsfälle
    Retro BIM

    Anwendungsfall Dokumentdefinition

    Austauschanforderungen

    Impressum

    Projektgruppe

    • Andreas Netz (netz work.ing GmbH)

    Partner

    Urheberrecht

    Dieses Werk ist lizenziert unter einer Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License (Namensnennung-Nicht-kommerziell-Weitergabe unter gleichen Bedingungen 4.0). Weitere Informationen finden Sie unter http://creativecommons.org/licenses/by-nc-sa/4.0/

    Handhabung

    The authors are in no case responsible for damages resulting from the application of use-cases. All applications must be checked by the responsible person before implementation.


    Zweck und Umfang

    • Improved information content through aggregated and verified basics. This reduces the degree of uncertainty and increases project stability in terms of costs, deadlines and quality for all parties involved in the construction. By eliminating media discontinuities, information once gained remains available.
    • More transparency for all those involved in the project thanks to a central basic model (can also be used as a communication medium).
    • Improved planning of the planning by definition of goal, employment and purpose of the BIM methodology in the project.
    • Synergies can be used already at the beginning of the model creation during the review of all fundamentals. With the creation of the model of minimum requirements (Retro BIM), it is recommended to simultaneously create a specific technical model (e.g. maintenance, operation).
      This early creation of a specialist model for operation and maintenance, enriched with historical information on construction, operation and maintenance, should, among other things, ensure a high degree of planning security in order to minimise project risks. For direct use in planning and realisation, a higher data/model accuracy can be assumed than in the extended project environment.
      (This technical model can simultaneously form the basis for the planning of maintenance and repair work and provides important input for the planning.)
    • Synergies between the technical models generate added value in planning and allow overdetermined control. The Retro BIM is the unique key between the models and can be used as a reference.
    • Retro BIM gains additional benefit in early planning phases, when decisions are based on sound foundations and the influence on the project is big.

    Beschreibung

    Creation of a digital twin of existing objects (as-built model of the construction incl. technical installations), which is geometrically verified and contains no redundant information and data per element.

    Output:

    • 3D model of the existing infrastructure incl. information on the respective components
    • Structured information possible to be exported and further processed via standardized interfaces

    Input:

    • Available information of all kinds (Input I)
    • Exploration information (project and client specific, Input II)

    Lebenszyklusphasen

    RIBA - plan of work

    BIM-Ziele & Vorteile

    • A digital 3D georeferenced model that represents the existing structure according to a the requirements, but at least in its spatial geometry, being georeferenced and in a veritable manner (digital twin).
    • All information contained should be centrally available, uniqe, structured and attributive in order to enable machine readability.
    • The exchange of information via standardized interfaces and formats (e.g. IFC Standard) in order to avoid information losses.
    • Creation of a common basis for all specific technical models.

    Abgrenzung

    This use case focuses on the creation and content of digital 3D models of existing infrastructure facilities. A distinction is made between minimum information (geometry (georeferenced), status of accuracy (verified/not verified), material) and specific information.

    Based on the minimum information, the existing model can be enriched, extended, linked with further specific information (e.g. GI systems, databases). Any information that goes beyond the minimum requirements has a specific purpose. This is always subject to customer-specific requirements as well as the data structure ofcustomer-specific specifications (e.g. modeling guidelines for element accuracy, structuring for existing databases).

    These specific technical models are the responsibility of the respective technical planners and are not part of this use case.


    Voraussetzungen / Rahmenbedingungen

    Normative basics, standards, structures:

    • Modeling standards (IFC standard, etc.)
    • Client - specific lists for attributes, component catalogs, component-dependent definition (e.g. LoD (LoG, LoI))

    Project-related basics / Input:
    For the Retro BIM, any format-independent information available for the construction/project can be used.
    A distinction must be made between the minimum requirements (geometry (georeferenced), the quality of the data (verified/not verified) and material) and all other specific information that generates added value for the information.

    The following is a non-exhaustive list of possible basics:

    • Data of the completed structure, such as 2D planning documents (digital or analogue) for shell, operating and safety equipment, etc.
    • Point clouds from scanner images, etc. for the accuracy status of the data
    • Information on drainage pipes (position, material, diameter, time of installation, etc.)
    • Geometry data for pipes (scan images, spatial position of pipes, etc.)
    • Track surveying, axle calculations, clearance analyses
    • Data digital / analogue to subsoil investigation (drillings, tomographies, etc.)
    • Information (reports, photo documentation, etc.) digital or analogue from condition surveys
    • Information on buildings and operations
    • Reports for quality controls, material inspections
    • Information on monitoring measures (geodetic measurements, geotechnical measurements such as inclinometers, settlement measurements, sensor data such as water level, condition of sewerage system, etc.)
    • Information on maintenance work / conversion work
    • Geological maps
    • Photogrammetry