Logotipo UCM buildingSMART International
  • Nenhum resultado encontrado
  • Casos de uso
  • Espaço de Cocriação
  • Comunidade
    • buildingSMART
      • buildingSMART International
      • buildingSMART Austria
      • buildingSMART Benelux
      • buildingSMART Germany
      • buildingSMART Switzerland
    • Organizações
      • HSLU
    • Parceiros de Colaboração
      • Empresas
      • Associações e Instituições
  • pt
    • en
    • de
    • fr
    • pt
  • Entrar
Localização
buildingSMART Switzerland Andreasstrasse 5 8050 Zurique (Suíça)ucm@buildingsmart.ch
Empresa
InícioSobre nósComunidadeTreinamento
Recursos
Casos de usoEspaço de cocriaçãoNotas de versãoFAQ
Logotipo da buildingSMART
Copyright © 2026 buildingSMART. Todos os direitos reservados.
v5.0.0ContatoDeclaração de Privacidade e CookiesTermos e Condições
Small IconAI Chat

    Holistic Evaluation

    Comentários

    Carregando comentários...

    AINDA NÃO SE CADASTROU?


    Cadastre-se gratuitamente no serviço Use Case Management para começar a criar seu primeiro caso de uso.


    Usuários cadastrados podem usar a área de download e as funções de comentário.

    Holistic Evaluation
    Tipo de Documento
    Caso de Uso
    GUID
    0E533A98-187E-4DFE-995A-6A1A9BE2C2CA
    Identificador
    BIMSpeed_UC9_Metabuild
    Fase do Ciclo de Vida
    ISO 22263
    Revisão
    -
    Status do Projeto
    Aprovado
    Nível de Maturidade
    Comprovado
    Publicado em
    20 de fev. de 2023
    Última Alteração
    20 de fev. de 2023
    Publicador
    Horizon Europe
    Autores
    • Julius Jacob
    Início
    Casos de uso
    Holistic Evaluation

    Caso de Uso Definição do Documento

    Requisitos de Troca

    Ficha Técnica

    Grupo de Projeto

    • Julius Jacob, jacob@metabuild.io
    • Tariq Kaddoura, kaddoura@metabuild.io

    Copyright

    All documents are licensed as a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License
    (Attribution-Non-Commercial-ShareAlike 4.0). Further information can be found at

    creativecommons

    Utilização

    The documents reflect the current best practice and do not claim to be complete. They should not to be understood in the sense of a generally valid recommendation or guideline from a legal point of view. The documents are intended to support appointing and appointed parties in the application of the BIM method. The documents must be adapted to the specific project requirements in each case. The examples listed do not claim to be complete. Its information is based on findings from practical experience and is accordingly to be understood as best practice and not universally applicable. Since we are in a phase in which definitions are only emerging, the publisher cannot guarantee the correctness of individual contents.

    Propósito e Escopo

    The analysis of renovation scenarios often includes a wide range of different considerations with multiple objectives. In addition to calculations on energy performance, this can include parameters on comfort (thermal, acoustic, air quality), costs (invest, LCC, operation, yield), sustainability (embodied CO2, emissions, water consumption) or other experts or stakeholders’ evaluations on e.g. aesthetic appearance.

    Much of this information comes from different, usually very specialized, tools, calculations and evaluations. Their results must be combined for a holistic view with multi-criteria objectives. This is done in a common dashboard.

    The application of this use case is particularly recommended if there are many possible renovation scenarios and if several tools, calculations and evaluations are used.

    The use case addresses planners and decision-makers as the primary actors involved in the decision-making process for selecting a renovation option to be implemented. Based on this, the representations are also suitable for explaining and justifying decisions to other stakeholders.

    Descrição

    Fases do Ciclo de Vida

    ISO 22263

    Processo

    Diagrama de processo

    Processo geral

    Descrição

    The process of holistic evaluation is depicted as:

     

     

    Input process: In the Holistic Performance Dashboard, results from simulations, calculations, expert assessment and other Decision-making processes are combined. This is done both for the unrenovated as-is state (baseline) and for each potential renovation scenarios.

    As each renovation project will use a different set of tools for its assessments, the Performance Dashboard is designed to flexibly display those data that are provided. It does not require a complete set of results from all tools to be functioning.

    The dashboard is integrated as a microservice into the BIM-SPEED platform: The results of the individual tools are transmitted to the platform as json text format. Depending on the tool, transmission can be automated (API connection), semi-automated (via assisting input interface) or manual (editing the json files or via intermediate CSV tool). The partial results are bundled automatically in one single file. Using this file, the dashboard can be accessed via the BIM-SPEED platform.

    Output process: Identifying the most suitable renovation scenarios by holistic assessment in the Dashboard is a manual process. In the dashboard itself, there are various display options for comparing the potential remediation variants with each other:

    1. Group views as table-view or card-view: Filter settings can be used here to further restrict the display (i.e. to show only variants that reach certain threshold values for energy efficiency).
    2. Detailed views of individual variants: The properties and KPIs results of a selected scenario are displayed. They are arranged as drilldowns in several orders.
    3. In Pareto graphs: Several variants are represented as a point cloud with respect to two target parameters. This representation is particularly suitable for highlighting the trade-off of low cost versus high quality/performance and for identifying reasonable variants along a Pareto front.

    It is possible to switch seamlessly between these view variants.

     

    ISO 22263

    2 | Outline feasibility
    4 | Outline conceptual design

    The use-case can be applied to compare different renovation scenarios. While in very early stages of design, the amount of information from detailed tools like simulations will be very limited, the Holistic evaluation UC can still be applied as a pre-selection with preliminary values (e.g. from experts input). 

    In this stage, tools results need to cover the relevant evaluation aspects for the decision-making process. Here, the Holistic evaluation UC assists in narrowing down the selection process to one or a few renovation scenarios. Based on the level of detail applied, these results serve as an input or already fulfill significant parts of the Outline Conceptual design stage.