Logo UCM buildingSMART International
  • Aucun résultat trouvé
  • Cas d'utilisation
  • Co-Creation Space
  • Communauté
    • buildingSMART
      • buildingSMART International
      • buildingSMART Autriche
      • buildingSMART Benelux
      • buildingSMART Allemagne
      • buildingSMART Switzerland
    • Organisations
      • HSLU
    • Partenaires de collaboration
      • Entreprises
      • Associations & Institutions
      • Expert
  • fr
    • en
    • de
    • fr
  • Connexion
Emplacement
buildingSMART Switzerland Andreasstrasse 5 8050 Zurich (Switzerland)ucm@buildingsmart.ch
Société
AccueilÀ proposCommunautéFormation
Ressources
Cas d'utilisationCo-creation spaceNotes de versionFAQ
buildingSMART Logo
Copyright © 2025 buildingSMART. Tous droits réservés.
ContactDéclaration de confidentialité et de cookiesTermes et conditions
Small IconAI Chat

    Infra Domain - Bridge IDM - 2024

    Commentaires

    Chargement des commentaires...

    PAS ENCORE INSCRIT?


    Inscrivez-vous au Service de Gestion des Cas d'Utilisation gratuitement pour commencer à créer votre premier cas d'utilisation.


    Les utilisateurs inscrits peuvent utiliser la zone de téléchargement et les fonctions de commentaire.

    Infra Domain - Bridge IDM - 2024
    Type de Document
    Manuel de livraison d'information
    GUID
    4C98B45E-06EE-42BB-B31F-FB48A2491B1A
    Identifiant
    -
    Phase du Cycle de Vie
    ISO 22263
    Révision
    V1.0.0
    Statut du Projet
    Brouillon
    Niveau de Maturité
    Perspective
    Publié le
    18 mars 2025
    Dernière Modification
    18 mars 2025
    Éditeur
    UCM Training
    Auteurs
    • Christophe Castaing (Project Lead), André Borrmann (Technical Lead), Pierre Benning, Claude Dumoulin, Tim Chipman, Juha Hyvärinen, Thomas Liebich, Stefan Markič, Laura Mol, Sergej Muhič, Hyounseok Moon, Heikki Myllymaki, Ning Suo, Shufeng Song, Ai Shanding, Liu Siming, Zhang Yi, Nobuyoshi Yabuki, Feifei Zhao.
    • Lars Wikström
    Accueil
    Cas d'utilisation
    Infra Domain - Bridge IDM - 2024

    Manuel de livraison d'information Définition du Document

    Exigences d'échange

    IFC/IDS

    Impression

    IFC sample file and Information Delivery Specification

    IFC sample file and Information Delivery Specification according to the IFC Bridge Requirements Analysis Report (2018) Annex 1: Data Requirements

     

    The transfer of the Requirements in Annex 1 to IDS was possible for all requirements covered by the 6 facets of the IDS v1.0 standard.

    these are: Classes, Attributes, Relations, Materials, Classification, Properties.

    Version IFC

    IFC 4.3 ADD2 (4.3.2.0)IFC 4.3 ADD2 (4.3.2.0)

    Fichier IFC

    Version IDS

    V1.0V1.0

    Fichier IDS

    Droits d'auteur

    All documents are licensed as a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License
    (Attribution-Non-Commercial-ShareAlike 4.0). Further information can be found at

    creativecommons

    Manipulation

    The documents reflect the current best practice and do not claim to be complete. They should not to be understood in the sense of a generally valid recommendation or guideline from a legal point of view. The documents are intended to support appointing and appointed parties in the application of the BIM method. The documents must be adapted to the specific project requirements in each case. The examples listed do not claim to be complete. Its information is based on findings from practical experience and is accordingly to be understood as best practice and not universally applicable. Since we are in a phase in which definitions are only emerging, the publisher cannot guarantee the correctness of individual contents.

    • TRV-hdmi2-BRO-4x3.ifc (ifc | 984,84 KB)
    • IFCBridge IDS xml.ids (ids | 56,14 KB)

    Résumé de la Gestion

    IFC-Bridge extends the IFC data model in order to allow the exact description of bridge semantics and geometry. The IFC-Bridge project was initiated by the bSI Infra Room as a fast track project with a project duration of two years. Given the restricted project duration, it was necessary to focus on common and widespread bridge types and to include only those use cases that provide a high value to the end users and require reasonable efforts for defining and validating the necessary IFC extensions.

    As a basis for defining the IFC-Bridge extensions, the international project team identified the most important uses cases of the data exchange processes in infrastructure projects.
    The point of departure for this process had been provided by the outcomes of the IFC-Infra overall architecture process.
    The defined list of use cases is not intended to be exhaustive. Instead, the most important use cases have been selected from interviews with experts having practical experience in
    bridge projects. In addition, the input from several national initiatives was taken into account:

    • China: CRBIM project
    • France: MINnD project
    • Germany: IFC-Bridge Expert Group
    • Nordic Chapter: IFC-Bridge Expert Group
    • USA: FHWA project

    The basic requirements for the IFC-Bridge extension have been derived from the identified use cases, by focusing on geometry representations and semantic descriptions. They have
    been distilled into three proposed Model View Definitions (MVDs) which were developed throughout the project.

    This IDM is completely based on the attached IFC-Bridge Requirements analysis document.

    Description

    The following bridge types, based on their structural system, are identified as the most common and widespread across the world. These bridge types are considered to be in scope
    for IFC-Bridge. The developed IFC-Bridge extensions were validated using examples of these bridge types.

    • Slab Bridge
    • Girder Bridge
    • Slab-Girder Bridge
    • Box-girder bridge
    • Frame Bridge
    • Rigid Frame Bridge
    • Culvert

    The following bridges types are also expected to be covered by IFC and the IFC-Bridge extension, however they were not subject to validation tests:

    • Truss bridge
    • Arch bridge
    • Cantilever bridge
    • Cable-stayed bridge
    • Suspension bridge

    From a material viewpoint, the following bridge types are covered:

    • Reinforced Concrete bridges
    • Prestressed Concrete bridges
    • Steel/Concrete Composite bridges
    • Steel girder bridges
    • Steel bridges

    Particular emphasis are placed on realizing the necessary data structures for modelling prestressing systems.

    Based on a careful analysis of the benefits of the individual uses cases and the complexity and effort involved with defining the necessary data structures, the project team decided to prioritize the following use cases for explicit consideration when designing the IFC-Bridge extension:

    • Initial State Modeling
    • Import of major road / railway parameters
    • Technical Visualization
    • Coordination / Collision Detection
    • 4D Construction Sequence Modeling
    • Quantity Take-Off
    • Progress Monitoring
    • As-built vs. as-planned comparison
    • Handover to asset management
    • Handover to GIS for spatial analysis
    • Design to design (reference model)
    • Design to Construction

    Due to their overly high complexity, the following use cases are out of scope of this fast-track project:

    • Design to Design (Full model logic)
    • Structural analysis
    • Code Compliance Checking
    • Drawing generation and exchange
    • Prefabrication and manufacturing

    It is emphasized that the exclusion from the fast-track project does not mean that these use cases cannot be covered by future extensions of IFC-Bridge. It has to be noted in particular, that the full design-to-design use case which incorporates the model’s design logic, is excluded here as it would require software vendors to adapt modeling functionality, which is not deemed practical for reasons of competitive advantage, compatibility, and cost/benefit. Currently, there is no well-defined industry need that would justify this effort.

    Phases du Cycle de Vie

    ISO 22263

    Fichiers

    • IR3-Bridge-WP1_RequirementAnalysisReport.pdf (pdf | 5,67 MB)

    Processus

    Diagramme de Processus

    Processus Global

    Description

    In order to identify the exchange requirements and associate them with dedicated data exchange scenarios the following process map has been defined (according to the IDM standard). Due to the large variety in national project setups and contractual models, the process map can only be seen as an example. Nevertheless, the defined exchange scenarios have a generic character and have, therefore, been a basis for the IFC-Bridge development.

     

    Plan d'Interaction

    Description

    Corresponding IFC Bridge use cases and proposed MVD per exchange scenario.