Logo UCM buildingSMART International
  • Aucun résultat trouvé
  • Cas d'utilisation
  • Co-Creation Space
  • Communauté
    • buildingSMART
      • buildingSMART International
      • buildingSMART Autriche
      • buildingSMART Benelux
      • buildingSMART Allemagne
      • buildingSMART Switzerland
    • Organisations
      • HSLU
    • Partenaires de collaboration
      • Entreprises
      • Associations & Institutions
      • Expert
  • fr
    • en
    • de
    • fr
  • Connexion
Emplacement
buildingSMART Switzerland Andreasstrasse 5 8050 Zurich (Switzerland)ucm@buildingsmart.ch
Société
AccueilÀ proposCommunautéFormation
Ressources
Cas d'utilisationCo-creation spaceNotes de versionFAQ
buildingSMART Logo
Copyright © 2025 buildingSMART. Tous droits réservés.
ContactDéclaration de confidentialité et de cookiesTermes et conditions
Small IconAI Chat
    • Accueil
    • Cas d'utilisation
    • Determination of Stakeholder's BIM Maturity

    Determination of Stakeholder's BIM Maturity

    Cas d'utilisation Définition du Document

    Exigences d'échange

    Impression

    Groupe de Projet

    • planen-bauen 4.0 GmbH

    Droits d'auteur

    All dokuments are licensed as a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License
    (Attribution-Non-Commercial-ShareAlike 4.0). Further information can be found at

    creativecommons

    Manipulation

    The documents reflect the current best practice and do not claim to be complete. They should not to be understood in the sense of a generally valid recommendation or guideline from a legal point of view. The documents are intended to support appointing and appointed parties in the application of the BIM method. The documents must be adapted to the specific project requirements in each case. The examples listed do not claim to be complete. Its information is based on findings from practical experience and is accordingly to be understood as best practice and not universally applicable. Since we are in a phase in which definitions are only emerging, the publisher cannot guarantee the correctness of individual contents.

    Commentaires

    Chargement des commentaires...

    PAS ENCORE INSCRIT?


    Inscrivez-vous au Service de Gestion des Cas d'Utilisation gratuitement pour commencer à créer votre premier cas d'utilisation.


    Les utilisateurs inscrits peuvent utiliser la zone de téléchargement et les fonctions de commentaire.

    Determination of Stakeholder's BIM Maturity
    Type de Document
    Cas d'utilisation
    GUID
    8F515D3F-DD69-437D-B973-15F93564E99A
    Identifiant
    BIMSpeed_UC19_PB40
    Phase du Cycle de Vie
    ISO 22263
    Révision
    -
    Statut du Projet
    Approuvé
    Niveau de Maturité
    Perspective
    Publié le
    31 août 2022
    Dernière Modification
    1 sept. 2022
    Éditeur
    BIM Speed
    Auteurs
    • Josephine Cooke

    Objectif et Portée

    The main aim of the use case is to give guidance to stakeholders regarding BIM implementation in renovation projects based on their respective level of BIM maturity. This is achieved through an online tool that guides the stakeholders to BIM use cases that are tailored to their respective level of BIM maturity. The overall benefit of using the tool lies in time and costs savings due to the better-informed user who can make appropriate decisions on their BIM usage.

    Description

    Phases du Cycle de Vie

    ISO 22263

    Processus

    Diagramme de Processus

    Processus Global

    Description

    The user opens the BIM-Speed platform and then the BIM Maturity Tool. There, an account must be created. As first step of the workflow the user enters general information on the company and saves the changes. See following picture:

    Then, the user starts a new questionnaire scan and answers these questions. See following picture:

    The user has the possibility to view the results of the stakeholders’ BIM maturity. Afterwards, the user enters information on the project, saves these changes and answers the questions regarding BIM use cases. See following picture:

    Then he or she can view the results of proposed BIM use cases. Depending on whether information has changed, the user can re-enter information on the company, the questions or the project. The end of the workflow is achieved when the user has viewed the status of BIM maturity and proposals for identified use cases. See following picture:

    The user has achieved various goals: 1. Determination of the feasibility of using BIM for renovation projects; 2. Definition of the scope of BIM implementation for renovation projects and 3. Facilitation of the implementation of BIM in renovation projects.

    The following training video gives detailed explanations to the use case:

    https://www.youtube.com/watch?v=g7tgYFPfX9Y

    Images
    • Process map.png (png | 78,02 KB)

    ISO 22263

    1 | Conception of need

    The use case facilitates stage 1 Conception of need. Firstly, this is achieved through the calculation of the stakeholders’ BIM maturity, as shown in the overall process model:

    Secondly, this is achieved through the presentation of possible BIM use cases adapted to the project and the stakeholder. See following detail of process map:

    By implementing this use case, the user achieves an overall facilitation of the use of the BIM methodology. This results in better quality of the BIM data and time and cost savings.

    UseCases.Details.Definition.PerformanceRequirement

    Some pre-requisites for using this tool are:

    • Internet connection
    • Requested input information