Logotipo UCM buildingSMART International
  • Nenhum resultado encontrado
  • Casos de uso
  • Espaço de Cocriação
  • Comunidade
    • buildingSMART
      • buildingSMART International
      • buildingSMART Austria
      • buildingSMART Benelux
      • buildingSMART Germany
      • buildingSMART Switzerland
    • Organizações
      • HSLU
    • Parceiros de Colaboração
      • Empresas
      • Associações e Instituições
  • pt
    • en
    • de
    • fr
    • pt
  • Entrar
Localização
buildingSMART Switzerland Andreasstrasse 5 8050 Zurique (Suíça)ucm@buildingsmart.ch
Empresa
InícioSobre nósComunidadeTreinamento
Recursos
Casos de usoEspaço de cocriaçãoNotas de versãoFAQ
Logotipo da buildingSMART
Copyright © 2026 buildingSMART. Todos os direitos reservados.
v5.0.0ContatoDeclaração de Privacidade e CookiesTermos e Condições
Small IconAI Chat

    Reinforcement modeling

    Comentários

    Carregando comentários...

    AINDA NÃO SE CADASTROU?


    Cadastre-se gratuitamente no serviço Use Case Management para começar a criar seu primeiro caso de uso.


    Usuários cadastrados podem usar a área de download e as funções de comentário.

    Reinforcement modeling
    Tipo de Documento
    Caso de Uso
    GUID
    2CD3B61A-674D-4019-9404-490FB4EF9C50
    Identificador
    -
    Fase do Ciclo de Vida
    HOAI
    Revisão
    -
    Status do Projeto
    Rascunho
    Nível de Maturidade
    Exemplo
    Publicado em
    25 de nov. de 2021
    Última Alteração
    25 de nov. de 2021
    Publicador
    buildingSMART Germany
    Autores
    -
    Início
    Casos de uso
    Reinforcement modeling

    Caso de Uso Definição do Documento

    Requisitos de Troca

    Ficha Técnica

    Parceiros

    Copyright

    All dokuments are licensed as a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License
    (Attribution-Non-Commercial-ShareAlike 4.0). Further information can be found at

    creativecommons

    Utilização

    The documents reflect the current best practice and do not claim to be complete. They should not to be understood in the sense of a generally valid recommendation or guideline from a legal point of view. The documents are intended to support appointing and appointed parties in the application of the BIM method. The documents must be adapted to the specific project requirements in each case. The examples listed do not claim to be complete. Its information is based on findings from practical experience and is accordingly to be understood as best practice and not universally applicable. Since we are in a phase in which definitions are only emerging, the publisher cannot guarantee the correctness of individual contents.

    Descrição

    Two essential bases are required for the design of reinforcement in reinforced concrete:
    The exact geometry of the structure to be executed with recesses and built-in parts (formwork dimensions), and the structural analysis (see Section 4), which, in addition to design information (e.g. maximum bar diameters or minimum spacing), includes the statically required amount of reinforcement for each component and its distribution.
    The reinforcement model is modeled as an independent structural design model. 
    A structural model is used as the model basis from which the formwork plans can be derived. This formwork model, if you want to call it that, must fulfill both the geometric (LOG) and attributive requirements (LOI) necessary for accurate execution planning.
    The reinforcement model created with a BIM authoring tool is then used in the subsequent BIM processes for quality assurance, coordination, quantity takeoff and can also serve as the basis for the automated creation of reinforcement components in prefabrication.